THE WOODLANDS — JD Warmack LP. has started construction on the 12-story, 300,000-square-foot Research Forest Lakeside – Building 4, located in Research Forest Lakeside between Lake Woodlands and Research Forest drives in The Woodlands. JD Warmack is the owner/developer of Research Forest Lakeside. The speculative development is pre-certified LEED Gold and the existing features include water fountains and a seven-story parking garage. Ziegler Cooper Architects and Odell Associates designed the property, as well as the rest of the office properties in the works at the 76-acre site that fronts Lake Woodlands. David E. Harvey Builders is the general contractor; Haynes Whaley is the structural engineer; DBR, MEP and Jones Carter are the civil engineers; and Clark Condon Associates is the landscape architectural firm. Talisman Energy has pre-leased six floors of the property.
309
previous post