ST. LOUIS — Saint Louis University plans to add two new residence halls and complete extensive renovations to existing facilities. Phase 1 of the proposed multi-phase plan is expected to include the construction of two new residence halls on the Frost campus; renovation of the Griesedieck complex, which includes Walsh and Clemens Halls; and the conversion of SLU’s Water Tower Inn at the Medical Center into graduate housing. Details for Phase 1 — including design, scope and budget — will be determined by an oversight committee that includes student representation, SLU’s architectural and construction partners Hastings+Chivetta Architects Inc., and McCarthy Building Cos. Inc. Construction on Phase 1 is slated to begin next spring. The first new residence hall is expected to open in August 2016, and the second new hall in August 2017. Renovation of the Griesedieck Complex set for completion in August 2019. New graduate student housing in the renovated Water Tower Inn at the Medical Center is expected to open in August 2016. The Division of Student Development, assisted by Chicago-based firm Brailsford & Dunlavey, led the master planning process.
SLU to Build New Residence Halls, Renovate Facilities
300
previous post