DORAL, FLA. — Miller Construction Co. has completed the 218,000-square-foot Transal Logistics Center in Doral for Gibson Development Partners. The two-building complex at 8301-8303 N.W. 27th St. provides warehouse/distribution space for international trade operations, with 30-foot clear heights, 54- by 50-foot column spacing, ESFR fire sprinklers and T-5 lighting with motion sensors. Boca Raton-based RLC Architects designed the property to feature reinforced concrete and tilt-wall buildings that wrap around a secure 180-foot truck court with dock-high loading for the center’s 69 bays. Bay sizes start at 8,910 square feet and units will range in size from 17,280 to 110,000 square feet, and Coral Gables-based Fairchild Partners is handling leasing. Additionally, Miller Construction is building Gateway Plaza at Doral, an 84,000-square-foot office, retail and restaurant center nearing completion near the Transal Logistics Center on N.W. 87th Avenue and N.W. 21st Terrace.
Miller Construction Co. Completes 218,000 SF Transal Logistics Center in Metro Miami
176