POOLER, GA. — Capital Development Partners Inc. plans to develop the Savannah Port Logistics Center, a 2.3 million-square-foot industrial project situated on 197 acres in Pooler, less than 10 miles from the Port of Savannah. The $125 million development will be built in two phases and will offer space for lease with modern specifications, transload capabilities, cross-dock, high cube and trailer storage facilities. Capital Development will break ground on Phase I of the project, totaling 537,000 square feet, in April. The facility will be on the GWRR rail line servicing the port and will be ready for occupancy in April 2019. The second phase will include a 1.3 million-square-foot build-to-suit facility, which will also be on the rail line. Construction is expected to begin on Phase II this year. Savannah Port Logistics Center will offer direct connection onsite to dual Class I railroads via CSX and Norfolk Southern, as well as easy access to the 1,200-acre Georgia Ports Authority Garden City Terminal, the largest and busiest single-container site in North America. Colliers International’s Savannah office and Atlanta-based NAI Brannen Goddard will handle the facility’s leasing assignment, which will offer spaces ranging from 300,000 square feet to 2.3 million square feet.
Capital Development to Build $125M, 2.3 MSF Logistics Center Near Port of Savannah
192