NORTH LAS VEGAS, NEV. — The Newport Beach, Calif., office of Trammell Crow Co. and Washington Capital Management, on behalf of its client, have commenced construction of Phase III at the 134.7-acre Golden Triangle Logistics Center in North Las Vegas.
The new phase will include 600,000 square feet of industrial space spread across two Class A buildings and bring the development’s footprint to nearly 2.3 million square feet across five buildings.
Located at the southwest corner of East Washburn Road and Statz Avenue, Building 4 will feature 400,371 square feet. Slated for a mid-year 2023 completion, the rear-load facility will offer 36-foot clear heights, 63 dock-high truck doors, two drive-in doors and parking for 338 cars and 74 trailers.
Located at 2815 E. Washburn Road, the 202,705-square-foot Building 5 is preleased to Fasteners Inc. Southwestern Supply. Scheduled for a spring 2023 occupancy, the rear-load facility will feature 36-foot clear heights, 29 dock-high truck doors, one drive-in door and parking for 127 cars and 35 trailers. The tenant, a wholesaler of construction equipment and supplies, will use the building as its West Coast distribution hub.
Rob Lujan of JLL represented Fasteners Inc. Southwestern Supply in the lease. Donna Alderson of Cushman & Wakefield and Kevin Higgins of CBRE serve as leasing agents for the development.
The first phase of Golden Triangle was completed in 2020 and includes two buildings totaling more than 1 million square feet. Phase II is a 652,000-square-foot facility, which was delivered in April 2022. Current tenants at the logistics center include Whitebox Technologies, Brothers Trading Co, ShipHero LLC and a manufacturing company.
At full build out, Golden Triangle Logistics Center will feature six facilities offering a total of nearly 2.9 million square feet of industrial space.