492
SEATTLE — Seattle-based Avenue 55 is developing Track 6, a multi-story industrial space located in the SoDo submarket of Seattle.
Situated on 2.4 acres, Track 6 will include a four-story, 212,516-square-foot building with dock-high and grade-level loading into forklift freight elevators, 54,000-square-foot floor plates, a ground-floor with 24-foor clear heights and 108 surface parking stalls.
Construction is slated to begin later this year with delivery scheduled for fourth-quarter 2020. The project team includes Nelson, formerly Craft Architects; Sierra Construction; and Barghausen Consulting Engineers.
Thad Mallory of Newmark Knight Frank’s Bellevue, Wash., office and Evan Lugar of Kidder Mathews are handling preleasing for the property.