560
HOUSTON — Cadence McShane Construction Co. will build the 82,000-square-foot Atherton Elementary School on behalf of the Houston Independent School District (ISD). The two-story school will replace an 49,110-square-foot facility that was constructed in 1957. Located at 2011 Solo in Houston, the project will break ground in May with a completion date set for July 2012. The new facility will accommodate more than 500 students from pre-kindergarten to fifth grade. It will include 30 classrooms, two science labs, a library, a full-service cafeteria, a practice gymnasium, administrative areas, a music and choir room, an art instructional space and performing arts area.