DAYTONA BEACH, FLA. — A new 718,000-square-foot hospital has opened in Daytona Beach. Florida Hospital Memorial Medical Center is a 10-story facility situated on a 135-acre campus near the interchange of Williamson Boulevard and Interstate 95. The project, which was built by Robins & Morton Construction Co. and designed by HuntonBrady Architects, features a first-floor emergency rooms that contains 53 treatment bays, three trauma units and a helipad. The third floor features a comprehensive diagnostic and treatment center for cardiovascular (CV) disease that includes the area’s only endovascular/hybrid operating room. The fourth and ninth floors feature the hospital’s BirthCare Center and the fifth through eighth floors are dedicated to inpatient care. In addition, a medical office building connected to the hospital’s first four floors was constructed. The new hospital replaces Florida Hospital Ormond Memorial, located in Ormond Beach, Fla., which closed following the opening of the new hospital.
FLORIDA HOSPITAL MEMORIAL MEDICAL CENTER OPENS
154
previous post