85
ORLANDO, FLA. — HJ High Construction has been selected as design/build contractor for Mitsubishi Power Systems America Inc.’s’ new manufacturing facility in Orlando. The fully air-conditioned 111,500-square-foot facility will feature two five-ton bridge cranes; 20,000 square feet of office space; and a rooftop observation land overlooking an array of photovoltaic solar panels, which will be installed at a later date. The facility will be constructed on a 10-month fast-track schedule.