214
ROLLING MEADOWS, ILL. — Krusinski Construction Co. has completed a 112,500-square-foot distribution and packaging facility for School Health, a provider of health supplies, services and solutions. The two-story building is located at 5600 Apollo Drive in Rolling Meadows. School Health is relocating from Hanover Park. The project included the demolition of an existing building onsite. The new facility features a clear height of 32 feet, more than a dozen dock doors, LED lighting and 30,000 square feet of office space. The project team included architect Ware Malcomb, civil engineer SpaceCo Inc. and Trammell Crow Co. as the owner’s representative.