191
HIALEAH, FLA. — Miller Construction has delivered CGI Doors and Windows’ office and manufacturing facility in Hialeah’s Countyline Corporate Park. CGI Windows and Doors moved into the new 325,000-square-foot building at 3780 W. 104th St. from a smaller location in nearby Miami. Flagler Global Logistics was the developer and Ware Malcomb designed the facility. Ware Malcomb offers integrated design services including architecture, planning, interior design, civil engineering and branding to diverse clients in both the private and public sectors.