181
TUSTIN, CALIF. — Barnhart Inc. has broken ground for the construction of a new $3.7 million aquatic center at Foothill High School in north Tustin. The project includes a new, Olympic-sized, 50-meter pool; a pool deck; exterior showers and drinking fountains; and a one-story mechanical/pool equipment building. Designed by San Diego-based NTD Architecture and funded by the Tustin Unified School District’s $95 million Bond Measure L, the aquatic center is scheduled for completion in time for the start of the 2010-2011 school year.