GEORGETOWN — SHW Group, an educational architecture and engineering firm, has been selected by the Georgetown Independent School District (ISD) to design two elementary schools — McCoy Elementary School to the southwest of Georgetown and a second, unnamed elementary school to the southeast — for a total project cost of $31.2 million. The existing McCoy Elementary School will be repurposed into an administration support facility. Plans for the new two-story, 88,000-square-foot McCoy Elementary School include sustainable features such as rainwater collection, a green roof, local construction materials and day lighting. It will serve 800 kindergarten through fifth grade students. Construction on the new McCoy will begin this spring and is scheduled for completion in fall 2012. The second, unnamed elementary school designed by SHW Group will open no later than 2014. Together, the two new elementary schools will serve 1,600 students.
141
previous post