THE WOODLANDS — Talisman Energy, USA, has leased approximately 218,000 square feet of space in Buildings 2 and 4 in Research Forest Lakeside, a 1.8 million-square-foot master planned community located between Lake Woodlands Drive and Research Forest Drive in The Woodlands. Buildings 2 and 4 are currently under construction and are slated for a spring 2013 completion. Houston-based Harvey Builders is the contractor and ZC+O (a collaboration between Ziegler Cooper Architects and Odell Associates) designed the Building 2 to receive LEED-Silver certification and Building 4 to receive LEED-Gold certification. Additionally, Haynes Whaley is the structural engineer for the project, DBR, MEP and Jones Carter are the civil engineers and Clark Condon Associates is the landscape architect. Greg Cizik and Edward Edson of Colliers International's Houston office, along with David Harvey and Sharma Christi of the firm's Calgary office, represented the tenant in the transaction. JD Warmack LP is the owner/developer of the master planned community.
230